Skip to main content
+61 2 8866 1100
Service Menu
News
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Rigid inclusions
Mass mixing
Dry soil mixing
Wet soil mixing
Vibro compaction
Vibro stone columns
Rapid Impact Compaction (RIC)
Impact rolling
Dynamic compaction and replacement
Wick drains / PVDs and earthquake drains
Ground freezing
Grouting
Jet grouting
Compaction grouting
Compensation / fracture grouting
Mine infill or cavity grouting
Permeation grouting
Rock / fissure grouting
Deep foundations
Cased CFA piles
Cased bored piles
CFA piles
Bored piles
Driven steel piles
Driven precast piles
Franki piles
Drilled displacement piles
Micropiles
Atlas piles
Ductile iron piles
Earth and water retention
Secant piled walls
Soldier and contiguous pile retaining walls
Diaphragm walls / barrettes
Slurry cut-off walls
Sheet piles
Anchors
Canopy / umbrella tubes
Soil nails
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Heavy foundations
Re-levelling structures
Underpinning
Containment
Excavation support
Remediation
Seepage control
Stabilisation
Mine stabilisation / void filling
Tunnelling
Marine structures
Slope stabilisation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Design and build
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Employment practices
Supporting our women
Quality
Sustainability
About us
Our history
Our leadership
Our policies
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Maroochydore to Mons interchanges
Project
Maroochydore to Mons interchanges Construction of multiple products, across multiple sites including solutions that took into account site-specific issues around space, safety and the environment…
/projects/maroochydore-mons-interchanges
Cranbourne Line Upgrade
Project
Cranbourne Line Upgrade Keller’s extensive range of solutions, plant and resources were provided to execute the piling works across multiple locations for another successful level crossing removal…
/projects/cranbourne-line-upgrade
Cairns Convention Centre, QLD
Project
Cairns Convention Centre, QLD Showcasing Keller innovation and expertise in the design and construction of foundation works for a A$180 million expansion. Cairns Convention Centre - Heavy foundations…
/projects/cairns-convention-centre-qld
Lilydale Level Crossing Removal Project
Project
Lilydale Level Crossing Removal Project While working within a rail corridor with extreme spatial, vibration and surface constraints and irregularities, Keller installed a driven sheet piling…
/projects/lilydale-level-crossing-removal-project
Glenroy Level Crossing Removal Project
Project
Glenroy Level Crossing Removal Project Ensuring potentially unstable ground conditions provided piles with maximum support. Glenroy level crossing removal project The project The Glenroy Level…
/projects/glenroy-level-crossing-removal-project
Collins Wharf One
Project
Collins Wharf One Read how Keller were devising solutions to limit the impact of piling on surrounding assets Collins Wharf One The project The Collins Wharf One Project in Melbourne’s Docklands…
/projects/collins-wharf-one
West Gate Tunnel Project - Port to City Zone
Project
West Gate Tunnel Project - Port to City Zone Achieving cost savings through value engineering which reduced pile lengths, managed geological variability and optimised load carrying capacity West Gate…
/projects/west-gate-tunnel-project-port-city-zone
60 King William Street
Project
60 King William Street Carrying out extensive analysis and design work for a fully cantilevered retention system with retained heights up to 7m. Heavy foundations for new commercial building in…
/projects/60-king-william-street
Swan River Bridge
Project
Swan River Bridge Read how Keller continually modified the drilling process to deal with fluctuating river levels. Heavy foundations for new swan river bridge The project Keller was engaged by Tonkin…
/projects/swan-river-bridge
Mascot Station
Project
Mascot Station Safely managing logistics for multiple foundation techniques on an extremely confined site abutting a key transport hub within a busy residential Metro suburb Diaphragm wall and ground…
/projects/mascot-station
New Sydney Fish Market
Project
New Sydney Fish Market Keller demonstrated our capability to undertake multiple techniques within a restricted site Multi product ground improvement and piling solution for wharfside development The…
/projects/new-sydney-fish-market
IOR Lytton Terminal Expansion
Project
IOR Lytton Terminal Expansion Minimising and controlling heave to finish the mass mixing to the required level to facilitate the construction of new tanks Mass mixing ground improvement solution for…
/projects/ior-lytton-terminal-expansion
Seafarers Residences
Project
Seafarers Residences Keller provided six techniques to deliver an optimal ground improvement and piling solution from a single contractor for this mixed-use commercial, residential development.…
/projects/seafarers-residences
The Eighth
Project
The Eighth Deep CFA solider piles in challenging conditions with a high water table and highly variable rock levels and strengths for this six level basement. The eighth south melbourne vic hero…
/projects/eighth
Prima Pearl
Project
Prima Pearl Keller developed a solution using CFA and jet grouting for excavation in soft clay soils within tight site constraints and no compromise on quality or safety Prima Pearl, Southbank VIC…
/projects/prima-pearl
Bell Street Level Crossing Removal Project
Project
Bell Street Level Crossing Removal Project Huge 2.1m monopile bored piles installed up to 33m under polymer, into siltstone at this level crossing removal project. Large diameter bored monopiles for…
/projects/bell-street-level-crossing-removal-project
Billys Lookout
Project
Billys Lookout Read about targeted grout placement in historical mine voids over 50,000m² using custom fly ash mixes. Minefill grouting for residential project Mine stabilisation, Billys Lookout NSW…
/projects/billys-lookout
Tailings Dam Capping
Project
Tailings Dam Capping A custom-built batch plant, capable of producing up to 300m³ of slurry per hour, was developed to cap an existing tailings dam without requiring surface access, unlike…
/projects/tailings-dam-capping
Newcastle Inner City Bypass
Project
Newcastle Inner City Bypass With no water supply available on site, the drilling system was modified to minimise water usage, and an in-house designed grout mix was batched offsite and delivered via…
/projects/newcastle-inner-city-bypass
BrisWest Mine Infill
Project
BrisWest Mine Infill Stabilising a former coal mine for industrial development with precision drilling, grouting 162,000m³, and barrier construction at depths up to 220m. Briswest Mine Infill,…
/projects/briswest-mine-infill
Pagination
Previous page
‹‹
Page 6
Next page
››