Skip to main content
+61 2 8866 1100
Service Menu
  • News
  • Resources
  • Careers
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Rigid inclusions
        • Mass mixing
        • Dry soil mixing
        • Wet soil mixing
        • Vibro compaction
        • Vibro stone columns
        • Rapid Impact Compaction (RIC)
        • Impact rolling
        • Dynamic compaction and replacement
        • Wick drains / PVDs and earthquake drains
        • Ground freezing
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Mine infill or cavity grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • Cased CFA piles
        • Cased bored piles
        • CFA piles
        • Bored piles
        • Driven steel piles
        • Driven precast piles
        • Franki piles
        • Drilled displacement piles
        • Micropiles
        • Atlas piles
        • Ductile iron piles
      • Earth and water retention
        • Secant piled walls
        • Soldier and contiguous pile retaining walls
        • Diaphragm walls / barrettes
        • Slurry cut-off walls
        • Sheet piles
        • Anchors
        • Canopy / umbrella tubes
        • Soil nails
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Remediation
      • Seepage control
      • Stabilisation
        • Mine stabilisation / void filling
        • Tunnelling
      • Marine structures
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Employment practices
    • Supporting our women
    • Quality
    • Sustainability
  • About us
    • Our history
    • Our leadership
    • Our policies
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (340)
  • Project (122)
  • News article (65)
  • Resource (41)
  • Content page (39)
  • Technique (36)
  • Solution (13)
  • Vacancy (10)
  • Market (6)
  • Office (5)
  • Landing page (3)
Request a quote
Get assistance
Maroochydore to Mons interchanges
Project
Maroochydore to Mons interchanges Construction of multiple products, across multiple sites including solutions that took into account site-specific issues around space, safety and the environment…
/projects/maroochydore-mons-interchanges
Cranbourne Line Upgrade
Project
Cranbourne Line Upgrade Keller’s extensive range of solutions, plant and resources were provided to execute the piling works across multiple locations for another successful level crossing removal…
/projects/cranbourne-line-upgrade
Cairns Convention Centre, QLD
Project
Cairns Convention Centre, QLD Showcasing Keller innovation and expertise in the design and construction of foundation works for a A$180 million expansion. Cairns Convention Centre - Heavy foundations…
/projects/cairns-convention-centre-qld
Lilydale Level Crossing Removal Project
Project
Lilydale Level Crossing Removal Project While working within a rail corridor with extreme spatial, vibration and surface constraints and irregularities, Keller installed a driven sheet piling…
/projects/lilydale-level-crossing-removal-project
Glenroy Level Crossing Removal Project
Project
Glenroy Level Crossing Removal Project Ensuring potentially unstable ground conditions provided piles with maximum support. Glenroy level crossing removal project The project The Glenroy Level…
/projects/glenroy-level-crossing-removal-project
Collins Wharf One
Project
Collins Wharf One Read how Keller were devising solutions to limit the impact of piling on surrounding assets Collins Wharf One The project The Collins Wharf One Project in Melbourne’s Docklands…
/projects/collins-wharf-one
West Gate Tunnel Project - Port to City Zone
Project
West Gate Tunnel Project - Port to City Zone Achieving cost savings through value engineering which reduced pile lengths, managed geological variability and optimised load carrying capacity West Gate…
/projects/west-gate-tunnel-project-port-city-zone
60 King William Street
Project
60 King William Street Carrying out extensive analysis and design work for a fully cantilevered retention system with retained heights up to 7m. Heavy foundations for new commercial building in…
/projects/60-king-william-street
Swan River Bridge
Project
Swan River Bridge Read how Keller continually modified the drilling process to deal with fluctuating river levels. Heavy foundations for new swan river bridge The project Keller was engaged by Tonkin…
/projects/swan-river-bridge
Mascot Station
Project
Mascot Station Safely managing logistics for multiple foundation techniques on an extremely confined site abutting a key transport hub within a busy residential Metro suburb Diaphragm wall and ground…
/projects/mascot-station
New Sydney Fish Market
Project
New Sydney Fish Market Keller demonstrated our capability to undertake multiple techniques within a restricted site Multi product ground improvement and piling solution for wharfside development The…
/projects/new-sydney-fish-market
IOR Lytton Terminal Expansion
Project
IOR Lytton Terminal Expansion Minimising and controlling heave to finish the mass mixing to the required level to facilitate the construction of new tanks Mass mixing ground improvement solution for…
/projects/ior-lytton-terminal-expansion
Seafarers Residences
Project
Seafarers Residences Keller provided six techniques to deliver an optimal ground improvement and piling solution from a single contractor for this mixed-use commercial, residential development.…
/projects/seafarers-residences
The Eighth
Project
The Eighth Deep CFA solider piles in challenging conditions with a high water table and highly variable rock levels and strengths for this six level basement.   The eighth south melbourne vic hero…
/projects/eighth
Prima Pearl
Project
Prima Pearl Keller developed a solution using CFA and jet grouting for excavation in soft clay soils within tight site constraints and no compromise on quality or safety   Prima Pearl, Southbank VIC…
/projects/prima-pearl
Bell Street Level Crossing Removal Project
Project
Bell Street Level Crossing Removal Project Huge 2.1m monopile bored piles installed up to 33m under polymer, into siltstone at this level crossing removal project. Large diameter bored monopiles for…
/projects/bell-street-level-crossing-removal-project
Billys Lookout
Project
Billys Lookout Read about targeted grout placement in historical mine voids over 50,000m² using custom fly ash mixes. Minefill grouting for residential project Mine stabilisation, Billys Lookout NSW…
/projects/billys-lookout
Tailings Dam Capping
Project
Tailings Dam Capping A custom-built batch plant, capable of producing up to 300m³ of slurry per hour, was developed to cap an existing tailings dam without requiring surface access, unlike…
/projects/tailings-dam-capping
Newcastle Inner City Bypass
Project
Newcastle Inner City Bypass With no water supply available on site, the drilling system was modified to minimise water usage, and an in-house designed grout mix was batched offsite and delivered via…
/projects/newcastle-inner-city-bypass
BrisWest Mine Infill
Project
BrisWest Mine Infill Stabilising a former coal mine for industrial development with precision drilling, grouting 162,000m³, and barrier construction at depths up to 220m. Briswest Mine Infill,…
/projects/briswest-mine-infill

Pagination

  • Previous page ‹‹
  • Page 6
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Australia 

Suite G.01
2 Lyonpark Road
Macquarie Park
NSW 2113

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube