Skip to main content
+61 2 8866 1100
Service Menu
  • News
  • Resources
  • Careers
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Rigid inclusions
        • Mass mixing
        • Dry soil mixing
        • Wet soil mixing
        • Vibro compaction
        • Vibro stone columns
        • Rapid Impact Compaction (RIC)
        • Impact rolling
        • Dynamic compaction and replacement
        • Wick drains / PVDs and earthquake drains
        • Ground freezing
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Mine infill or cavity grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • Cased CFA piles
        • Cased bored piles
        • CFA piles
        • Bored piles
        • Driven steel piles
        • Driven precast piles
        • Franki piles
        • Drilled displacement piles
        • Micropiles
        • Atlas piles
        • Ductile iron piles
      • Earth and water retention
        • Secant piled walls
        • Soldier and contiguous pile retaining walls
        • Diaphragm walls / barrettes
        • Slurry cut-off walls
        • Sheet piles
        • Anchors
        • Canopy / umbrella tubes
        • Soil nails
    • Solutions
      • Heavy foundations
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Environmental remediation
      • Seepage control
      • Stabilisation
        • Mine stabilisation / void filling
        • Tunnelling
      • Marine structures
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Employment practices
    • Supporting our women
    • Quality
    • Sustainability
  • About us
    • Our history
    • Our leadership
    • Our policies
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

News

Search all newsClear filters
Breadcrumb
  1. Home
  2. News
67 articles
Cairns Convention Centre, QLD
Project
Cairns Convention Centre, QLD
16 Aug 2021
Multi-technique solution for Cairns landmark
Read article
Shahed Khan - Graduate Engineer
Workplace and people
In the spotlight - Shahed Khan
5 Aug 2021
Shahed was recently promoted to Mechanical Engineer
Read article
Maroochydore to Mons Interchange
Project
Maroochydore Road and Mons Road
4 Aug 2021
A highway project on the road to success
Read article
Keller's Design and Estimating Manager - Jurie Engelbrecht
Workplace and people
Jurie Engelbrecht
14 Jul 2021
Congratulations on your promotion to Design and Estimating Manager
Read article
Melbourne Metro Tunnel - Cross Passage 21
Project
Melbourne Metro Tunnel - Cross Passage 21
27 Apr 2021
Keller completes challenging tunnel project
Read article
Randwick Racecourse NSW
Project
Randwick Racecourse, NSW
26 Mar 2021
Keller races to finish stand foundations
Read article
Senior Project Engineer - Sophie Rex
Workplace and people
In the spotlight - Sophie Rex
9 Mar 2021
We caught up with Sophie to discuss her role including the joy of being a working mum
Read article
Diego Garcia - Franki pile remote projects
Project
Diego Garcia project
26 Feb 2021
Keller completes remote piling challenge
Read article
Keller Apprentice Gabe Wasson St Marys Workshop
Workplace and people
In the spotlight - Gabe Wasson
11 Feb 2021
We had a chat with Gabe about his apprenticeship with Keller
Read article
Keller Graduate Engineer, Tristan Dowd
Workplace and people
In the spotlight – Tristan Dowd
21 Jan 2021
After his first year with Keller, we caught up with Graduate Tristan
Read article
Melbourne Quarter Tower - Piling
Project
Melbourne Quarter Tower
10 Dec 2020
Keller back at Melbourne Quarter for new tower
Read article
Werribee Level Crossing Removal Project Bored Piles Rail Projects
Project
Werribee Street Level Crossing, VIC
8 Dec 2020
Intense schedule brings out the best in Keller
Read article
  • Show more news

Register for alerts

Read our privacy policy

Alert types
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Australia 

Suite G.01
2 Lyonpark Road
Macquarie Park
NSW 2113

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube