Skip to main content
+61 2 8866 1100
Service Menu
  • News
  • Resources
  • Careers
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Rigid inclusions
        • Mass mixing
        • Dry soil mixing
        • Wet soil mixing
        • Vibro compaction
        • Vibro stone columns
        • Rapid Impact Compaction (RIC)
        • Impact rolling
        • Dynamic compaction and replacement
        • Wick drains / PVDs and earthquake drains
        • Ground freezing
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Mine infill or cavity grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • Cased CFA piles
        • Cased bored piles
        • CFA piles
        • Bored piles
        • Driven steel piles
        • Driven precast piles
        • Franki piles
        • Drilled displacement piles
        • Micropiles
        • Atlas piles
        • Ductile iron piles
      • Earth and water retention
        • Secant piled walls
        • Soldier and contiguous pile retaining walls
        • Diaphragm walls / barrettes
        • Slurry cut-off walls
        • Sheet piles
        • Anchors
        • Canopy / umbrella tubes
        • Soil nails
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Remediation
      • Seepage control
      • Stabilisation
        • Mine stabilisation / void filling
        • Tunnelling
      • Marine structures
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Employment practices
    • Supporting our women
    • Quality
    • Sustainability
  • About us
    • Our history
    • Our leadership
    • Our policies
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (339)
  • Project (122)
  • News article (65)
  • Resource (41)
  • Content page (39)
  • Technique (36)
  • Solution (13)
  • Vacancy (9)
  • Market (6)
  • Office (5)
  • Landing page (3)
Request a quote
Get assistance
Randwick Racecourse
Project
Randwick Racecourse A complex project with limited schedule, large load bearing considerations and a tight site Randwick Racecourse NSW The project The new Winx Stand, an impressive two-storey…
/projects/randwick-racecourse
Diego Garcia
Project
Diego Garcia An extremely remote location for people, plant and equipment while under the restrictions of COVID. Diego Garcia The project Diego Garcia is a 30km2 British-owned coral atoll that’s been…
/projects/diego-garcia
Randwick Racecourse, NSW
News article
Randwick Racecourse, NSW News article category Project One of Australia’s most famous racecourses is building an impressive new stand that will cater for the thousands of visitors who usually flock…
/news/randwick-racecourse-nsw
Download
Building a better world
Resource
Building a better world The cover to Keller's brochure that explains how it's enabling low impact, low carbon construction Brochure Enabling low-impact, low carbon construction Download
/node/3671
Geotechnical solutions for a low-carbon, low impact built environment
Content page
Geotechnical solutions for a low-carbon, low impact built environment The construction sector, and the geotechnical sector within it, is well positioned to benefit from a growing population, climate…
/how-we-work/sustainability/geotechnical-solutions-low-carbon-low-impact-built-environment
Melbourne Metro Tunnel - Cross Passage 21
News article
Melbourne Metro Tunnel - Cross Passage 21 News article category Project After months of careful design planning and on-site expertise, Keller has successfully completed a unique in-tunnel grouting…
/news/melbourne-metro-tunnel-cross-passage-21
West Gate Tunnel Project
Project
West Gate Tunnel Project Keller expertise conquered a complex project, with challenging logistics and unfavourable geology, installing up to 2.1m diameter piles up to 50m deep in soft marine…
/projects/west-gate-tunnel-project
Westconnex M5
Project
Westconnex M5 Grouting work along tunnel alignment performed from isolated discrete compounds to minimise impact in sensitive environment. Westconnex M5 The project The new $4.4 billion Westconnex M5…
/projects/westconnex-m5
Metro Tunnel Project - Cross Passage 21
Project
Metro Tunnel Project - Cross Passage 21 Keller designed and fabricated two jack-up working platforms to enable elevated access to work area whilst providing uninterrupted access for tunnel operations…
/projects/metro-tunnel-project-cross-passage-21
Download
Application Form - Field Positions
Resource
Application Form - Field Positions Field positions application form Form Please complete and supply this application form together with your letter and CV to apply for any field positions Download
/node/3716
Forrestfield Tunnel - Cross Passage 10
Project
Forrestfield Tunnel - Cross Passage 10 Construction of a structural secant wall comprising of partially cased bored piles through variable ground conditions including partially treated soils…
/projects/forrestfield-tunnel-cross-passage-10
Cased CFA piles
Technique
Cased CFA piles The cased CFA pile is a variation on the traditional CFA pile. Cased CFA piles Common uses Provide structural support Provide earth retention, especially on site boundaries or close…
/expertise/techniques/cased-cfa-piles
Canyon G
Project
Canyon G High pile tension capacities achieved by rock penetration within live operational facility...  Canyon G FMG Port Hedland CFA piles The project The Canyon G project will result in an…
/projects/canyon-g
Werribee Level Crossing Removal Project
Project
Werribee Level Crossing Removal Project Up to 2,500mm large diameter piles installed in complex ground conditions including the introduction of Thermal Integrity Profiling equipment to assess pile…
/projects/werribee-level-crossing-removal-project
Maroochydore to Mons interchanges
Project
Maroochydore to Mons interchanges Construction of multiple products, across multiple sites including solutions that took into account site-specific issues around space, safety and the environment…
/projects/maroochydore-mons-interchanges
Jurie Engelbrecht
News article
Jurie Engelbrecht News article category Workplace and people We caught up with Jurie to discuss his years in construction and how he feels about his recent promotion with Keller Keller's Design…
/news/jurie-engelbrecht
Maroochydore Road and Mons Road
News article
Maroochydore Road and Mons Road News article category Project Keller innovation came to the fore on a project connected to the A$12.6 billion, 15-year upgrade of the Brisbane to Cairns Bruce Highway…
/news/maroochydore-road-and-mons-road
In the spotlight - Shahed Khan
News article
In the spotlight - Shahed Khan News article category Workplace and people Shahed was recently promoted to Mechanical Engineer for Keller at our Braeside yard and we caught up with him to discuss his…
/news/spotlight-shahed-khan
Cairns Convention Centre, QLD
News article
Cairns Convention Centre, QLD News article category Project Keller was given an opportunity to showcase its range of geotechnical techniques in a major construction project in Queensland.  Cairns…
/news/cairns-convention-centre-qld
Cranbourne Line Upgrade
Project
Cranbourne Line Upgrade Keller’s extensive range of solutions, plant and resources were provided to execute the piling works across multiple locations for another successful level crossing removal…
/projects/cranbourne-line-upgrade

Pagination

  • Previous page ‹‹
  • Page 12
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Australia 

Suite G.01
2 Lyonpark Road
Macquarie Park
NSW 2113

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube