Skip to main content
+61 2 8866 1100
Service Menu
  • News
  • Resources
  • Careers
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Rigid inclusions
        • Mass mixing
        • Dry soil mixing
        • Wet soil mixing
        • Vibro compaction
        • Vibro stone columns
        • Rapid Impact Compaction (RIC)
        • Impact rolling
        • Dynamic compaction and replacement
        • Wick drains / PVDs and earthquake drains
        • Ground freezing
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Mine infill or cavity grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • Cased CFA piles
        • Cased bored piles
        • CFA piles
        • Bored piles
        • Driven steel piles
        • Driven precast piles
        • Franki piles
        • Drilled displacement piles
        • Micropiles
        • Atlas piles
        • Ductile iron piles
      • Earth and water retention
        • Secant piled walls
        • Soldier and contiguous pile retaining walls
        • Diaphragm walls / barrettes
        • Slurry cut-off walls
        • Sheet piles
        • Anchors
        • Canopy / umbrella tubes
        • Soil nails
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Remediation
      • Seepage control
      • Stabilisation
        • Mine stabilisation / void filling
        • Tunnelling
      • Marine structures
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Employment practices
    • Supporting our women
    • Quality
    • Sustainability
  • About us
    • Our history
    • Our leadership
    • Our policies
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (331)
  • Project (121)
  • News article (64)
  • Resource (42)
  • Content page (39)
  • Technique (36)
  • Solution (13)
  • Market (6)
  • Office (5)
  • Vacancy (5)
Request a quote
Get assistance
Influencing the industry
Content page

Kerry Porritt, Group Company Secretary and Legal Advisor at Keller, has been announced as one of the top 100 Most Influential Women in the Engineering Sector. 

/how-we-work/diversity-and-inclusion/influencing-industry
Diversity and inclusion
Content page

Our people are our greatest strength and we believe that a diverse workforce is important to our long-term success. 

/how-we-work/diversity-and-inclusion
Melbourne Metro Tunnel - Cross Passage 21
News article

After months of careful design planning and on-site expertise, Keller has successfully completed a unique in-tunnel grouting project for one of Melbourne’s highest profile programmes – the Metro Tunnel.

/news/melbourne-metro-tunnel-cross-passage-21
West Gate Tunnel Project
Project
/projects/west-gate-tunnel-project
Westconnex M5
Project
/projects/westconnex-m5
Metro Tunnel Project - Cross Passage 21
Project
/projects/metro-tunnel-project-cross-passage-21
Download
Application Form - Field Positions
Resource
Please complete and supply this application form together with your letter and CV to apply for any field positions
/node/3716
Forrestfield Tunnel - Cross Passage 10
Project
/projects/forrestfield-tunnel-cross-passage-10
Cased CFA piles
Technique

The cased CFA pile is a variation on the traditional CFA pile.

/expertise/techniques/cased-cfa-piles
Canyon G
Project
/projects/canyon-g
Werribee Level Crossing Removal Project
Project
/projects/werribee-level-crossing-removal-project
Maroochydore to Mons interchanges
Project
/projects/maroochydore-mons-interchanges
Jurie Engelbrecht
News article

We caught up with Jurie to discuss his years in construction and how he feels about his recent promotion with Keller

/news/jurie-engelbrecht
Maroochydore Road and Mons Road
News article

Keller innovation came to the fore on a project connected to the A$12.6 billion, 15-year upgrade of the Brisbane to Cairns Bruce Highway in Queensland. The programme of works comprises 37 projects aimed at increasing capacity, improving safety and reducing flooding.

/news/maroochydore-road-and-mons-road
In the spotlight - Shahed Khan
News article

Shahed was recently promoted to Mechanical Engineer for Keller at our Braeside yard and we caught up with him to discuss his career and future plans.

/news/spotlight-shahed-khan
Cairns Convention Centre, QLD
News article

Keller was given an opportunity to showcase its range of geotechnical techniques in a major construction project in Queensland. 

/news/cairns-convention-centre-qld
Cranbourne Line Upgrade
Project
/projects/cranbourne-line-upgrade
Cairns Convention Centre, QLD
Project
/projects/cairns-convention-centre-qld
Geotechnical solutions for a low-carbon, low impact built environment
Content page

The construction sector, and the geotechnical sector within it, is well positioned to benefit from a growing population, climate resilience projects and from the expansion of cities and infrastructure. But it will be constrained by new limits on carbon, resource use and waste production; and…

/how-we-work/sustainability/geotechnical-solutions-low-carbon-low-impact-built-environment
In the spotlight - Mark Newton
News article

In a career that’s taken him from Leeds, England to Melbourne, Australia via Malaysia and the Middle East during an economic boom, Mark Newton has done it all. We talk to Keller Australia’s Major Projects Director and diaphragm wall expert about his fascinating career and his love of motorbikes…

/news/spotlight-mark-newton
  • Show more results
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Australia 

Suite G.01
2 Lyonpark Road
Macquarie Park
NSW 2113

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube