Skip to main content
+61 2 8866 1100
Service Menu
News
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Rigid inclusions
Mass mixing
Dry soil mixing
Wet soil mixing
Vibro compaction
Vibro stone columns
Rapid Impact Compaction (RIC)
Impact rolling
Dynamic compaction and replacement
Wick drains / PVDs and earthquake drains
Ground freezing
Grouting
Jet grouting
Compaction grouting
Compensation / fracture grouting
Mine infill or cavity grouting
Permeation grouting
Rock / fissure grouting
Deep foundations
Cased CFA piles
Cased bored piles
CFA piles
Bored piles
Driven steel piles
Driven precast piles
Franki piles
Drilled displacement piles
Micropiles
Atlas piles
Ductile iron piles
Earth and water retention
Secant piled walls
Soldier and contiguous pile retaining walls
Diaphragm walls / barrettes
Slurry cut-off walls
Sheet piles
Anchors
Canopy / umbrella tubes
Soil nails
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Heavy foundations
Re-levelling structures
Underpinning
Containment
Excavation support
Remediation
Seepage control
Stabilisation
Mine stabilisation / void filling
Tunnelling
Marine structures
Slope stabilisation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Design and build
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Employment practices
Supporting our women
Quality
Sustainability
About us
Our history
Our leadership
Our policies
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Gateway - Leach Hwy / Abernethy Rd
Project
Gateway - Leach Hwy / Abernethy Rd Successful completion of the first metropolitan CFA pile bridge for MRWA Gateway The project The $1 billion Gateway WA project is designed to ease the daily…
/projects/gateway-leach-hwy-abernethy-rd
Woolooware Bay Town Centre – stage 4
Project
Woolooware Bay Town Centre – stage 4 Read how Keller improved the existing bearing capacity from 100kPa to greater than 250kPa through the rapid impact compaction works woolooware-bay-town-centre-NSW…
/projects/woolooware-bay-town-centre-stage-4
Cooks River – Sydney Metro project
Project
Cooks River – Sydney Metro project Looking for a solution to soft soils... Keller provided bearing capacity and slope stabilisation solution using rigid inclusions to assist with a proposed…
/projects/cooks-river-sydney-metro-project
627 Chapel Street
Project
627 Chapel Street How Keller provided a solution to complex soil-structure interactions to support an old basement and a new retention system 627-chapel-street-bored-piles-soldier-piled-wall The…
/projects/627-chapel-street
Lucky Bay Silos
Project
Lucky Bay Silos Lucky Bay is now successfully operational providing cost saving benefits to local SA farmers... Read how Keller provided significant cost saving benefits through our alternative…
/projects/lucky-bay-silos
Mt Arthur Coal Extension
Project
Mt Arthur Coal Extension Mt Arthur Coal extension included a cut-off wall installation up to 14m below ground level through think layers of poorly graded river gravels. Read how Keller achieved a…
/projects/mt-arthur-coal-extension
Kendall Bay Sediment Remediation
Project
Kendall Bay Sediment Remediation Read about our in-situ stabilisation of >7000m3 of contaminated marine sediments using mass mixing techniques provided perfect solution to meet the project…
/projects/kendall-bay-sediment-remediation
Osborne North Development Project
Project
Osborne North Development Project Read about our rigorous design solution to achieve an optimised pile length with minimal waste at the Osborne North Development Project. Osborne North Development…
/projects/osborne-north-development-project
Central Station - Sydney Metro Project
Project
Central Station - Sydney Metro Project Read how we were operating on narrow platform in restricted 3m headroom within live train station... Central Station NSW - Sydney Metro Project - Micropiles The…
/projects/central-station-sydney-metro-project
Forrestfield Tunnel
Project
Forrestfield Tunnel We completed treatment of a 3m zone around the tunnel was completed from surface level and from within the tunnel. Read on for details.. Forrestfield Tunnel WA - Permeation…
/projects/forrestfield-tunnel
Mordialloc Freeway
Project
Mordialloc Freeway An innovative mass mixing alternative solution that provided environmental advantages, significant project cost savings while out performing expectations Mordialloc Freeway VIC -…
/projects/mordialloc-freeway
Melbourne Quarter Tower
Project
Melbourne Quarter Tower Drilling under fluid produced perfect quality piles in these complex ground conditions Melbourne Quarter Tower - Piling The project The Melbourne Quarter promises to be an…
/projects/melbourne-quarter-tower
Randwick Racecourse
Project
Randwick Racecourse A complex project with limited schedule, large load bearing considerations and a tight site Randwick Racecourse NSW The project The new Winx Stand, an impressive two-storey…
/projects/randwick-racecourse
Diego Garcia
Project
Diego Garcia An extremely remote location for people, plant and equipment while under the restrictions of COVID. Diego Garcia The project Diego Garcia is a 30km2 British-owned coral atoll that’s been…
/projects/diego-garcia
West Gate Tunnel Project
Project
West Gate Tunnel Project Keller expertise conquered a complex project, with challenging logistics and unfavourable geology, installing up to 2.1m diameter piles up to 50m deep in soft marine…
/projects/west-gate-tunnel-project
Westconnex M5
Project
Westconnex M5 Grouting work along tunnel alignment performed from isolated discrete compounds to minimise impact in sensitive environment. Westconnex M5 The project The new $4.4 billion Westconnex M5…
/projects/westconnex-m5
Metro Tunnel Project - Cross Passage 21
Project
Metro Tunnel Project - Cross Passage 21 Keller designed and fabricated two jack-up working platforms to enable elevated access to work area whilst providing uninterrupted access for tunnel operations…
/projects/metro-tunnel-project-cross-passage-21
Forrestfield Tunnel - Cross Passage 10
Project
Forrestfield Tunnel - Cross Passage 10 Construction of a structural secant wall comprising of partially cased bored piles through variable ground conditions including partially treated soils…
/projects/forrestfield-tunnel-cross-passage-10
Canyon G
Project
Canyon G High pile tension capacities achieved by rock penetration within live operational facility... Canyon G FMG Port Hedland CFA piles The project The Canyon G project will result in an…
/projects/canyon-g
Werribee Level Crossing Removal Project
Project
Werribee Level Crossing Removal Project Up to 2,500mm large diameter piles installed in complex ground conditions including the introduction of Thermal Integrity Profiling equipment to assess pile…
/projects/werribee-level-crossing-removal-project
Pagination
Previous page
‹‹
Page 5
Next page
››