Skip to main content
+61 2 8866 1100
Service Menu
News
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Rigid inclusions
Mass mixing
Dry soil mixing
Wet soil mixing
Vibro compaction
Vibro stone columns
Rapid Impact Compaction (RIC)
Impact rolling
Dynamic compaction and replacement
Wick drains / PVDs and earthquake drains
Ground freezing
Grouting
Jet grouting
Compaction grouting
Compensation / fracture grouting
Mine infill or cavity grouting
Permeation grouting
Rock / fissure grouting
Deep foundations
Cased CFA piles
Cased bored piles
CFA piles
Bored piles
Driven steel piles
Driven precast piles
Franki piles
Drilled displacement piles
Micropiles
Atlas piles
Ductile iron piles
Earth and water retention
Secant piled walls
Soldier and contiguous pile retaining walls
Diaphragm walls / barrettes
Slurry cut-off walls
Sheet piles
Anchors
Canopy / umbrella tubes
Soil nails
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Heavy foundations
Re-levelling structures
Underpinning
Containment
Excavation support
Remediation
Seepage control
Stabilisation
Mine stabilisation / void filling
Tunnelling
Marine structures
Slope stabilisation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Design and build
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Employment practices
Supporting our women
Quality
Sustainability
About us
Our history
Our leadership
Our policies
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Bosco Apartments
Project
Bosco Apartments A piling platform built at short notice using in-situ contaminated material using locally based plant allowed our work to commence quickly and the overall project to avoid delay. …
/projects/bosco-apartments
Ichthys LNG Project - Inpex
Project
Ichthys LNG Project - Inpex Read how Keller provided a solution which allowed for a substantial reduction in the clearing area through the environmentally sensitive mangroves. Photo from Ichthys LNG…
/projects/ichthys-lng-project-inpex
QAL Tailings Dam
Project
QAL Tailings Dam Keller's innovative mass mixing solution allowed substantial cost and time savings over the conventional dig and replace methods. Photo from QAL The project Queensland Alumina…
/projects/qal-tailings-dam
Tiger Brennan Drive Duplication
Project
Tiger Brennan Drive Duplication Battling Darwin's wet season our cost effective mass mixing design was proved to be the optimum solution under inundated culvert extensions. Photo from Tiger…
/projects/tiger-brennan-drive-duplication
Ballina Bypass - Pacific Highway
Project
Ballina Bypass - Pacific Highway Read how Keller's approach to very soft soils provided a cost effective treatment for our client. Photo from Ballina Bypass The project A new bridge over…
/projects/ballina-bypass-pacific-highway
Albury Former Gasworks
Project
Albury Former Gasworks Treating deep contaminated soils beneath the CBD site Keller developed an in-situ soil solidification scheme to encapsulate in-situ contaminants in the soil. Photo from Albury…
/projects/albury-former-gasworks
Tomago Gas Tank
Project
Tomago Gas Tank Learn how our vibro compaction solution strengthened potentially liquefiable sand layers at the Tomago project site. Photo from Tomago Gas Tank The project A new 60m diameter LNG tank…
/projects/tomago-gas-tank
Vopak Storage Tanks
Project
Vopak Storage Tanks A vibro compaction solution provided a uniform foundation layer for a new bitumen storage tank farm and loading facility within its existing Port Botany terminal. Vopak Storage…
/projects/vopak-storage-tanks
Kununurra Diversion Dam
Project
Kununurra Diversion Dam A remote project and a collaborative approach with the main contractor including value engineering in the initial design layout to optimise site methodology and create cost…
/projects/kununurra-diversion-dam
Wastewater Treatment Plant
Project
Wastewater Treatment Plant In-situ compaction of the upper 2-4m of loose sand avoided excavation and replacement of the soil in thin layers while high productivity compaction permitted the client…
/projects/wastewater-treatment-plant
Perth Stadium
Project
Perth Stadium An accelerated project program achieved by pre-works foundations package delivered by Keller as principal contractor. Photo from Perth Stadium The project Perth Stadium is a multi-…
/projects/perth-stadium
Utah Point Expansion Project
Project
Utah Point Expansion Project Keller provided an alternative solution that had significant cost and time savings. Group photo from Utah Point Expansion The project The Utah Point Expansion Project at…
/projects/utah-point-expansion-project
Wheatstone LNG Facility - Haul Roads
Project
Wheatstone LNG Facility - Haul Roads Dynamic replacement allowed construction of heavy haul roads and duct banks across areas of soft marine clays at a major LNG project. Photo from Wheatstone Haul…
/projects/wheatstone-lng-facility-haul-roads
Ranger Mine Pit 1 Remediation
Project
Ranger Mine Pit 1 Remediation Installation of wick drains over water into a backfilled pit containing tailing and process water. Photo from Ranger Mine The project The mined out pit was backfilled…
/projects/ranger-mine-pit-1-remediation
Christchurch Town Hall Restoration
Project
Christchurch Town Hall Restoration Read about Keller's design and construction of jet grout columns with a challenging limited access heritage building environment. Photo of Christchurch Town…
/projects/christchurch-town-hall-restoration
HMAS Platypus
Project
HMAS Platypus Learn about Keller's design and construction approach for a support of a heritage seawall to enable ex-situ remediation of former gasworks contamination. Photo of HMAS Platypus…
/projects/hmas-platypus
Port Botany Stormwater Pits
Project
Port Botany Stormwater Pits Jet grouting has been used to create foundations for two stormwater pits resulting in significant time and cost savings. Photo from Port Botany Stormwater Pits The project…
/projects/port-botany-stormwater-pits
Kingsford Smith Drive
Project
Kingsford Smith Drive Read how Keller successfully managed challenging site conditions positioned between a busy roadway and river. Photo from KSD site The project Kingsford Smith Drive is a major…
/projects/kingsford-smith-drive
Melbourne Square
Project
Melbourne Square Keller completed the treatment for 2 core blocks for new tower structures. Photo of Melbourne Square The project As part of the Melbourne Square mixed commercial and residential…
/projects/melbourne-square
The Star Casino
Project
The Star Casino Saving the client from unnecessary demolition of existing structures, Keller utilised low headroom drill rigs and specialist light weight piling equipment on low lying platforms…
/projects/star-casino
Pagination
Previous page
‹‹
Page 4
Next page
››