Skip to main content
+61 2 8866 1100
Service Menu
News
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Rigid inclusions
Mass mixing
Dry soil mixing
Wet soil mixing
Vibro compaction
Vibro stone columns
Rapid Impact Compaction (RIC)
Impact rolling
Dynamic compaction and replacement
Wick drains / PVDs and earthquake drains
Ground freezing
Grouting
Jet grouting
Compaction grouting
Compensation / fracture grouting
Mine infill or cavity grouting
Permeation grouting
Rock / fissure grouting
Deep foundations
Cased CFA piles
Cased bored piles
CFA piles
Bored piles
Driven steel piles
Driven precast piles
Franki piles
Drilled displacement piles
Micropiles
Atlas piles
Ductile iron piles
Earth and water retention
Secant piled walls
Soldier and contiguous pile retaining walls
Diaphragm walls / barrettes
Slurry cut-off walls
Sheet piles
Anchors
Canopy / umbrella tubes
Soil nails
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Heavy foundations
Re-levelling structures
Underpinning
Containment
Excavation support
Remediation
Seepage control
Stabilisation
Mine stabilisation / void filling
Tunnelling
Marine structures
Slope stabilisation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Design and build
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Employment practices
Supporting our women
Quality
Sustainability
About us
Our history
Our leadership
Our policies
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Green Square
Project
Green Square A multi-product solution providing the required lateral retention with the added benefit of a deep barrier to minimise groundwater inflow. Photo from Green Square site The project The…
/projects/green-square
Perth New Metro Rail
Project
Perth New Metro Rail Keller delivered a solution that met client demands of building protection and absolute minimal disruption to building tenants. An Engineers Australia winning project. Artists…
/projects/perth-new-metro-rail
Hunter Expressway Minefill
Project
Hunter Expressway Minefill With the use of proprietary down-hole camera to confirm findings and grout voids together with inclined drilling systems allowed Keller to perform the mine filling without…
/projects/hunter-expressway-minefill
Ipswich Motorway
Project
Ipswich Motorway The largest abandoned mine infilling project performed at the time in the southern hemisphere with >140,000m3 of infill placed. Photo from Ipswich Motorway The project An upgrade…
/projects/ipswich-motorway
Colliery Street Mine Infilling Works
Project
Colliery Street Mine Infilling Works A careful design and control and monitoring of grouting of historic mine workings has protected homes from potential subsidence and allowed construction of a new…
/projects/colliery-street-mine-infilling-works
Koolan Island
Project
Koolan Island Construction of a complex seepage barrier in a very remote location and challenging environment with up to an 11m tidal range. Photo of Koolan Island WA The project The Koolan Island…
/projects/koolan-island
Ascot Racing Club
Project
Ascot Racing Club An innovative combination of enlarged pile heads at column locations with the CFA technique. Photo Ascot Racing Club The project As part of a $37m redevelopment of Eagle Farm…
/projects/ascot-racing-club
480 Hay Street
Project
480 Hay Street Read about the installation of a high-quality diaphragm wall to tight construction tolerances with no leaks or damp patches evident on the final exposed wall. Photo from 480 Hay Street…
/projects/480-hay-street
Sunshine Plaza Shopping Centre
Project
Sunshine Plaza Shopping Centre Meeting the requirements of a greenstar environmentally sustainable project, Keller completed foundations working in and around a busy, operational shopping centre.…
/projects/sunshine-plaza-shopping-centre
Newstead Central Stage 4
Project
Newstead Central Stage 4 A sheet pile cut-off wall installed to reduce the impact of tidal influences from the Brisbane River on temporary works. Photo from Newstead Central The project Stage 4…
/projects/newstead-central-stage-4
The Store Carpark
Project
The Store Carpark CFA piles drilled up to 47m deep unlocking client savings over alternative methods for the redevelopment of the iconic Store building in Newcastle. Photo from The Store Newcastle…
/projects/store-carpark
Marriott Hotel
Project
Marriott Hotel Foundations installed within an existing building for a high-profile project, sheet piles installed very close to an existing wall and managing multiple techniques while maintaining…
/projects/marriott-hotel
Bayswater Grade Separation
Project
Bayswater Grade Separation More than 1000 safe crane lifting operations adjacent to live operating rail system... Photo from Bayswater Grade Separation The project The Victorian Government…
/projects/bayswater-grade-separation
Gold Coast Light Rail - Stage 2
Project
Gold Coast Light Rail - Stage 2 While meeting very strict deadlines to have the upgrade ready for the 2018 Commonwealth Games, Keller worked adjacent to the Gold Coast Highway with no disruption to…
/projects/gold-coast-light-rail-stage-2
Wilpinjong Transmission Towers
Project
Wilpinjong Transmission Towers Completed ahead of schedule our cased bored piles were installed to extremely tight tolerances to meet the pylon dimensions. Photo from Wilpinjong Mine The project As…
/projects/wilpinjong-transmission-towers
Reservoir Level Crossing Removal
Project
Reservoir Level Crossing Removal The use of large diameter monopiles eliminated the need for pile caps, saving our client programme time and cost of reinforced pile caps. Photo from Reservoir LXRP…
/projects/reservoir-level-crossing-removal
Gold Coast Light Rail
Project
Gold Coast Light Rail Time and cost savings identified over excavate and replacement option on other parts of the project through joint constructability workshops. Photo from Gold Coast Light Rail…
/projects/gold-coast-light-rail
405 Bourke Street
Project
405 Bourke Street Up to 140 mega Newton load on a single pile - a first for Australia. Photo from 405 Bourke Street The project The foundations for the 40-storey mixed-use tower included the…
/projects/405-bourke-street
St Albans Level Crossing Removal Project
Project
St Albans Level Crossing Removal Project Read how Keller achieved high daily production rates due to experienced teams and the right equipment. Photo from St Albans LXRP The project The St Albans…
/projects/st-albans-level-crossing-removal-project
Wheatstone LNG Facility
Project
Wheatstone LNG Facility One of the world's largest ever piling projects where Keller were recognised for multiple safety awards from both Bechtel and Chevron. Photo from Wheatstone LNG The…
/projects/wheatstone-lng-facility
Pagination
Previous page
‹‹
Page 5
Next page
››