Skip to main content
+61 2 8866 1100
Service Menu
  • News
  • Resources
  • Careers
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Rigid inclusions
        • Mass mixing
        • Dry soil mixing
        • Wet soil mixing
        • Vibro compaction
        • Vibro stone columns
        • Rapid Impact Compaction (RIC)
        • Impact rolling
        • Dynamic compaction and replacement
        • Wick drains / PVDs and earthquake drains
        • Ground freezing
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation / fracture grouting
        • Mine infill or cavity grouting
        • Permeation grouting
        • Rock / fissure grouting
      • Deep foundations
        • Cased CFA piles
        • Cased bored piles
        • CFA piles
        • Bored piles
        • Driven steel piles
        • Driven precast piles
        • Franki piles
        • Drilled displacement piles
        • Micropiles
        • Atlas piles
        • Ductile iron piles
      • Earth and water retention
        • Secant piled walls
        • Soldier and contiguous pile retaining walls
        • Diaphragm walls / barrettes
        • Slurry cut-off walls
        • Sheet piles
        • Anchors
        • Canopy / umbrella tubes
        • Soil nails
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Liquefaction mitigation
        • Heavy foundations
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Remediation
      • Seepage control
      • Stabilisation
        • Mine stabilisation / void filling
        • Tunnelling
      • Marine structures
      • Slope stabilisation
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional / public
      • Power
      • Residential
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Diversity and inclusion
    • Employment practices
    • Supporting our women
    • Quality
    • Sustainability
  • About us
    • Our history
    • Our leadership
    • Our policies
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (339)
  • Project (122)
  • News article (65)
  • Resource (41)
  • Content page (39)
  • Technique (36)
  • Solution (13)
  • Vacancy (9)
  • Market (6)
  • Office (5)
  • Landing page (3)
Request a quote
Get assistance
Green Square
Project
Green Square A multi-product solution providing the required lateral retention with the added benefit of a deep barrier to minimise groundwater inflow. Photo from Green Square site The project The…
/projects/green-square
Perth New Metro Rail
Project
Perth New Metro Rail Keller delivered a solution that met client demands of building protection and absolute minimal disruption to building tenants. An Engineers Australia winning project. Artists…
/projects/perth-new-metro-rail
Hunter Expressway Minefill
Project
Hunter Expressway Minefill With the use of proprietary down-hole camera to confirm findings and grout voids together with inclined drilling systems allowed Keller to perform the mine filling without…
/projects/hunter-expressway-minefill
Ipswich Motorway
Project
Ipswich Motorway The largest abandoned mine infilling project performed at the time in the southern hemisphere with >140,000m3 of infill placed. Photo from Ipswich Motorway The project An upgrade…
/projects/ipswich-motorway
Colliery Street Mine Infilling Works
Project
Colliery Street Mine Infilling Works A careful design and control and monitoring of grouting of historic mine workings has protected homes from potential subsidence and allowed construction of a new…
/projects/colliery-street-mine-infilling-works
Koolan Island
Project
Koolan Island Construction of a complex seepage barrier in a very remote location and challenging environment with up to an 11m tidal range. Photo of Koolan Island WA The project The Koolan Island…
/projects/koolan-island
Ascot Racing Club
Project
Ascot Racing Club An innovative combination of enlarged pile heads at column locations with the CFA technique. Photo Ascot Racing Club The project As part of a $37m redevelopment of Eagle Farm…
/projects/ascot-racing-club
480 Hay Street
Project
480 Hay Street Read about the installation of a high-quality diaphragm wall to tight construction tolerances with no leaks or damp patches evident on the final exposed wall. Photo from 480 Hay Street…
/projects/480-hay-street
Sunshine Plaza Shopping Centre
Project
Sunshine Plaza Shopping Centre Meeting the requirements of a greenstar environmentally sustainable project, Keller completed foundations working in and around a busy, operational shopping centre.…
/projects/sunshine-plaza-shopping-centre
Newstead Central Stage 4
Project
Newstead Central Stage 4 A sheet pile cut-off wall installed to reduce the impact of tidal influences from the Brisbane River on temporary works. Photo from Newstead Central The project Stage 4…
/projects/newstead-central-stage-4
The Store Carpark
Project
The Store Carpark CFA piles drilled up to 47m deep unlocking client savings over alternative methods for the redevelopment of the iconic Store building in Newcastle. Photo from The Store Newcastle…
/projects/store-carpark
Marriott Hotel
Project
Marriott Hotel Foundations installed within an existing building for a high-profile project, sheet piles installed very close to an existing wall and managing multiple techniques while maintaining…
/projects/marriott-hotel
Bayswater Grade Separation
Project
Bayswater Grade Separation More than 1000 safe crane lifting operations adjacent to live operating rail system... Photo from Bayswater Grade Separation The project The Victorian Government…
/projects/bayswater-grade-separation
Gold Coast Light Rail - Stage 2
Project
Gold Coast Light Rail - Stage 2 While meeting very strict deadlines to have the upgrade ready for the 2018 Commonwealth Games, Keller worked adjacent to the Gold Coast Highway with no disruption to…
/projects/gold-coast-light-rail-stage-2
Wilpinjong Transmission Towers
Project
Wilpinjong Transmission Towers Completed ahead of schedule our cased bored piles were installed to extremely tight tolerances to meet the pylon dimensions. Photo from Wilpinjong Mine The project As…
/projects/wilpinjong-transmission-towers
Reservoir Level Crossing Removal
Project
Reservoir Level Crossing Removal The use of large diameter monopiles eliminated the need for pile caps, saving our client programme time and cost of reinforced pile caps. Photo from Reservoir LXRP…
/projects/reservoir-level-crossing-removal
Gold Coast Light Rail
Project
Gold Coast Light Rail Time and cost savings identified over excavate and replacement option on other parts of the project through joint constructability workshops. Photo from Gold Coast Light Rail…
/projects/gold-coast-light-rail
405 Bourke Street
Project
405 Bourke Street Up to 140 mega Newton load on a single pile - a first for Australia. Photo from 405 Bourke Street The project The foundations for the 40-storey mixed-use tower included the…
/projects/405-bourke-street
St Albans Level Crossing Removal Project
Project
St Albans Level Crossing Removal Project Read how Keller achieved high daily production rates due to experienced teams and the right equipment. Photo from St Albans LXRP The project The St Albans…
/projects/st-albans-level-crossing-removal-project
Wheatstone LNG Facility
Project
Wheatstone LNG Facility One of the world's largest ever piling projects where Keller were recognised for multiple safety awards from both Bechtel and Chevron. Photo from Wheatstone LNG The…
/projects/wheatstone-lng-facility

Pagination

  • Previous page ‹‹
  • Page 5
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Australia 

Suite G.01
2 Lyonpark Road
Macquarie Park
NSW 2113

Footer links
  • Keller Group
  • Careers

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Sitemap
Social links
  • LinkedIn
  • YouTube