Skip to main content
+61 2 8866 1100
Service Menu
News
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Rigid inclusions
Mass mixing
Dry soil mixing
Wet soil mixing
Vibro compaction
Vibro stone columns
Rapid Impact Compaction (RIC)
Impact rolling
Dynamic compaction and replacement
Wick drains / PVDs and earthquake drains
Ground freezing
Grouting
Jet grouting
Compaction grouting
Compensation / fracture grouting
Mine infill or cavity grouting
Permeation grouting
Rock / fissure grouting
Deep foundations
Cased CFA piles
Cased bored piles
CFA piles
Bored piles
Driven steel piles
Driven precast piles
Franki piles
Drilled displacement piles
Micropiles
Atlas piles
Ductile iron piles
Earth and water retention
Secant piled walls
Soldier and contiguous pile retaining walls
Diaphragm walls / barrettes
Slurry cut-off walls
Sheet piles
Anchors
Canopy / umbrella tubes
Soil nails
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Heavy foundations
Re-levelling structures
Underpinning
Containment
Excavation support
Remediation
Seepage control
Stabilisation
Mine stabilisation / void filling
Tunnelling
Marine structures
Slope stabilisation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Design and build
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Employment practices
Supporting our women
Quality
Sustainability
About us
Our history
Our leadership
Our policies
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
889 Collins Street
Project
889 Collins Street Development of an installation process and sequence that ensured driven precast piles could be installed adjacent to a movement sensitive retaining wall. Photo from 889 Collins…
/projects/889-collins-street
OK Tedi Mine
Project
OK Tedi Mine Time and cost savings unlocked for our client via early contractor involvement and installation of piles through uncontrolled fill including 500mm diameter boulders, just a few of the…
/projects/ok-tedi-mine
Osborne Naval Shipbuilding Precinct
Project
Osborne Naval Shipbuilding Precinct Keller was contracted to design and construct the foundation piles for 3 no. large manufacturing buildings used to process steel plate and fabricate new warships.…
/projects/osborne-naval-shipbuilding-precinct
Rosewood Bridge Replacement
Project
Rosewood Bridge Replacement Designed a cost-effective solution that reduced the number of micro piles and saved an estimated 25 percent on client’s bottom line. Photo Rosewood Timber Bridge The…
/projects/rosewood-bridge-replacement
Darling Harbour Live
Project
Darling Harbour Live A design and construct micropile solution was adopted to support to support 2600kN Ultimate loads. Photo from Darling Harbour Live The project Darling Harbour is the location of…
/projects/darling-harbour-live
Dugald River Mine
Project
Dugald River Mine Micropiles and micro-fine rock grouting enabled construction of four mine ventilation shafts to be completed using raise boring in collapsing ground. Photo from Dugald River Mine…
/projects/dugald-river-mine
One Central Park
Project
One Central Park A successful completion installation of micropiles under highly confined site conditions at the top of a deep basement. Photo One Central Park NSW The project Central Park in Sydney…
/projects/one-central-park
Sadlier Crossing Bridge Replacement
Project
Sadlier Crossing Bridge Replacement Keller installed micropiles beneath an operational railway in limited headroom and restricted access. Photo from Sadliers Crossing The project The Project involved…
/projects/sadlier-crossing-bridge-replacement
Queenswharf
Project
Queenswharf Construction of micropiles in an environmentally sensitive location. Photo of Queenswharf Micropiles The project As part of the greater ‘Destination Brisbane’ casino development, new…
/projects/queenswharf
Onesky Equipment Room
Project
Onesky Equipment Room A piling solution with virtually zero spoil, minimal noise and elimination of vibrations was the perfect solution for this vibration sensitive project. Photo from Onesky…
/projects/onesky-equipment-room
Brisbane Casino Towers
Project
Brisbane Casino Towers Design, construct and delivery of the 6-storey deep retention wall system. Photo from Brisbane Casino Towers The project Casino Towers is a luxury 30-storey residential tower,…
/projects/brisbane-casino-towers
Iluka - The Spirit - Development
Project
Iluka - The Spirit - Development An 88 storey tower over a 6 level basement carpark on Queensland's Surfers Paradise was a project Keller had to be part of... Photo from Iluka The project When…
/projects/iluka-spirit-development
Pierce Avenue Caloundra
Project
Pierce Avenue Caloundra By adopting Keller’s tried and tested standard low permeability mix the main contractor was able to shorten the overall project program providing significant competitive…
/projects/pierce-avenue-caloundra
Amrun Arraw Dam
Project
Amrun Arraw Dam Installation of over 22,000m2 of cement bentonite slurry wall and a detailed pre-construction plan ensured all risks could be mitigated against. Photo Amrun Arraw Dam NSW The project…
/projects/amrun-arraw-dam
Ipswich Motorway Surface Water Outfall
Project
Ipswich Motorway Surface Water Outfall Read how Keller designed and engineered a 30m x 6m platform over water for plant and personnel to safely carry out works. Photo from Ipswich Motorway Surface…
/projects/ipswich-motorway-surface-water-outfall
Overseas Passenger Terminal
Project
Overseas Passenger Terminal Vertical and raked multi-strand ground anchors are providing the high load capacities needed to allow larger cruise ships to dock at the Overseas Passenger Terminal in…
/projects/overseas-passenger-terminal
Wynyard Walk
Project
Wynyard Walk Accurate drilling and installation of canopy tubes very close to the underside of road service trenches. Wynyard Walk Site Photo The project Wynyard Walk provides a pedestrian link…
/projects/wynyard-walk
Greenvale Reservoir Upgrade
Project
Greenvale Reservoir Upgrade This project included a significant dam wall upgrade involving a secant pile filter wall linking the main dam and wing embankment chimney filters. Photo from Greenvale Dam…
/projects/greenvale-reservoir-upgrade
Catherine Hill Mine
Project
Catherine Hill Mine Re-drilling minimised due to use of specialised equipment improving borehole stability and drilling accuracy. Photo Catherine Hill Mine The project Investigations for a new…
/projects/catherine-hill-mine
Cairns Aquarium
Project
Cairns Aquarium Our experience provided a pile technique that would performance consistently under high tension and compression load conditions, in variable ground. Photo of Cairns Aquarium The…
/projects/cairns-aquarium
Pagination
Previous page
‹‹
Page 6
Next page
››