Skip to main content
+61 2 8866 1100
Service Menu
News
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Rigid inclusions
Mass mixing
Dry soil mixing
Wet soil mixing
Vibro compaction
Vibro stone columns
Rapid Impact Compaction (RIC)
Impact rolling
Dynamic compaction and replacement
Wick drains / PVDs and earthquake drains
Ground freezing
Grouting
Jet grouting
Compaction grouting
Compensation / fracture grouting
Mine infill or cavity grouting
Permeation grouting
Rock / fissure grouting
Deep foundations
Cased CFA piles
Cased bored piles
CFA piles
Bored piles
Driven steel piles
Driven precast piles
Franki piles
Drilled displacement piles
Micropiles
Atlas piles
Ductile iron piles
Earth and water retention
Secant piled walls
Soldier and contiguous pile retaining walls
Diaphragm walls / barrettes
Slurry cut-off walls
Sheet piles
Anchors
Canopy / umbrella tubes
Soil nails
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Liquefaction mitigation
Heavy foundations
Re-levelling structures
Underpinning
Containment
Excavation support
Remediation
Seepage control
Stabilisation
Mine stabilisation / void filling
Tunnelling
Marine structures
Slope stabilisation
Markets
Commercial
Industrial
Infrastructure
Institutional / public
Power
Residential
Design and build
Projects
How we work
Code of conduct
Values
Health and safety
Diversity and inclusion
Employment practices
Supporting our women
Quality
Sustainability
About us
Our history
Our leadership
Our policies
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Overseas Passenger Terminal
Project
Overseas Passenger Terminal Vertical and raked multi-strand ground anchors are providing the high load capacities needed to allow larger cruise ships to dock at the Overseas Passenger Terminal in…
/projects/overseas-passenger-terminal
Wynyard Walk
Project
Wynyard Walk Accurate drilling and installation of canopy tubes very close to the underside of road service trenches. Wynyard Walk Site Photo The project Wynyard Walk provides a pedestrian link…
/projects/wynyard-walk
Greenvale Reservoir Upgrade
Project
Greenvale Reservoir Upgrade This project included a significant dam wall upgrade involving a secant pile filter wall linking the main dam and wing embankment chimney filters. Photo from Greenvale Dam…
/projects/greenvale-reservoir-upgrade
Catherine Hill Mine
Project
Catherine Hill Mine Re-drilling minimised due to use of specialised equipment improving borehole stability and drilling accuracy. Photo Catherine Hill Mine The project Investigations for a new…
/projects/catherine-hill-mine
Cairns Aquarium
Project
Cairns Aquarium Our experience provided a pile technique that would performance consistently under high tension and compression load conditions, in variable ground. Photo of Cairns Aquarium The…
/projects/cairns-aquarium
George Fisher Mine
Project
George Fisher Mine A second ventilation shaft and a fill pass were raise-bored for the new mining area. Photo from George Fisher Mine The project The George Fisher Mine is a mine located near Mount…
/projects/george-fisher-mine
Tennis centre roof
Project
Tennis centre roof Another successful Frankipile project for North Queensland Cairns tennis centre roof The project A new roof will be built over the centre court at the Cairns International Tennis…
/projects/tennis-centre-roof
Sydenham Station
Project
Sydenham Station Improvement of soft clay below future embankment to ensure stability Sydenham Station The project Joint contractors John Holland and Laing O’Rourke were awarded the $300M upgrade of…
/projects/sydenham-station
Festival Plaza & Car Park
Project
Festival Plaza & Car Park Through value-engineered solutions and careful integration into the main scheme, Keller reduced the client’s program by 4 weeks, read how... Festival Plaza The project…
/projects/festival-plaza-car-park
One Circular Quay
Project
One Circular Quay Working around an existing building, an historic brick lined drain and unexpected obstructions in soil layers.. read how we got through these challenges to deliver a successful…
/projects/one-circular-quay
Qantas flight training centre
Project
Qantas flight training centre Displacement method avoided the generation of contaminated spoil with consequential cost and environment benefits. Qantas training facility The project A new Qantas…
/projects/qantas-flight-training-centre
The Queenslea
Project
The Queenslea CFA piles coring through limestone for a new luxury aged care facility. The Queenslea WA The project The growth in demand for aged care facilities has led to an increase in private…
/projects/queenslea
Salt Lake Potash
Project
Salt Lake Potash Keller assisted with the design development and installation of 8km of sheet piles for the evaporation ponds. Salt Lake Potash The project Salt Lake Potash have a number of leases on…
/projects/salt-lake-potash
Focus Apartments
Project
Focus Apartments Keller was contracted to design and construct foundation piles in very close proximity to a heritage façade. Read on here... Focus Apartments The project Focus Apartments is a…
/projects/focus-apartments
Eastern Portal - Metro Tunnel Project
Project
Eastern Portal - Metro Tunnel Project A successful project delivered within a residential area, adjacent live rail, and neighbouring an existing 5m batter. Eastern Portal The project Eastern portal…
/projects/eastern-portal-metro-tunnel-project
The Normanby
Project
The Normanby Keller resolves numerous project engineering complexities with five solutions... The Normanby The project Situated in Fisherman’s Bend, Melbourne’s largest area of urban renewal, The…
/projects/normanby
ANZAC Station - Metro Tunnel Project
Project
ANZAC Station - Metro Tunnel Project 690 linear metres of diaphragm wall for a 20m deep, 300m long metro station, all installed within a live tram and road corridor. ANZAC Station The project The…
/projects/anzac-station-metro-tunnel-project
South City Square – Stage 1,2,3,4
Project
South City Square – Stage 1,2,3,4 Working alongside an active road, existing structures and overhead / underground services with no safety or quality issues. South City Stage 1-4 The project The…
/projects/south-city-square-stage-1234
O'Connell Park
Project
O'Connell Park Read about our installation of cased bored piles to form a secant pile wall for a 19 metre shaft O'connell Park The project As population increases, so too does the amount of…
/projects/oconnell-park
Third Avenue Bridge
Project
Third Avenue Bridge Innovative 1200mm diameter CFA secant piles successfully constructed to accommodate significant retained height Third Ave Bridge The project The Third Avenue Bridge replaced a 106…
/projects/third-avenue-bridge
Pagination
Previous page
‹‹
Page 4
Next page
››